What Happens on Roof Replacement Day (and How to Get Your Home Ready)

On most homes, our crew tears off the old roof, fixes what's under it, and has the new roof on by evening. Here's how roof replacement day goes, step by step, and how to get your home ready.

By Don Hane, Navy Combat Veteran

Most homeowners only replace a roof once or twice in their life, so it makes sense to wonder what the day will actually look like. The short answer: on most homes, our crew tears off the old roof, fixes what’s under it, and has the new roof on by evening, about 1 day on average. Our roof replacement page covers everything included in the job, and if you’re still planning the budget, roof financing through Acorn Finance lets you spread it into monthly payments.

Here’s how the day goes, step by step, plus a short list of things you can do the night before to make it easy on you.

Before the day: what’s already settled

By the time a crew shows up, the big decisions are already made. You’ve had a free inspection, you’ve seen photos of your roof, and you have a written quote that spells out the material, the color and the full scope. Nothing about the price is a surprise on install day.

A few other things get handled ahead of time:

  • Material and color. You pick the manufacturer, product line and color. We’re certified with GAF, CertainTeed, Owens Corning, TAMKO and Malarkey, so the roof goes on to the standard their warranties require.
  • HOA approval. Many neighborhoods around Murfreesboro limit shingle colors or require architectural shingles. We give you the exact manufacturer, line and color name so you can get approval in writing, and we schedule the install after you have it.
  • Permits. Whether a permit is needed depends on your city and the scope of the job. If tear-off turns up decking or rafters that have to be replaced, a permit can be required, and we pull it and schedule the inspection.
  • Weather. We watch the forecast closely. If rain or wind moves in, we move the date rather than risk your home.

If you haven’t had the inspection yet, our post on what happens during a roof inspection walks through it.

The night before: how to get your home ready

You don’t have to do much, but these small things help the day go smoothly:

  • Move cars out of the garage and driveway. We need room for the dumpster or trailer, and you don’t want to be blocked in.
  • Take pictures and mirrors off the walls. Tear-off and nailing send vibration through the house. Anything hanging on an outside wall, or on the top floor, is safer on a bed or the floor for the day.
  • Cover things in the attic. Some dust and old granules can fall through the boards during tear-off. If you store holiday boxes or clothes up there, throw an old sheet over them.
  • Plan for pets and kids. It’s loud. Most dogs are happier at a friend’s house or in a quiet room with music on. Kids and pets should stay clear of the work area and the driveway all day.
  • Move patio furniture, grills and planters away from the house. We put tarps over landscaping, but it helps to have the easy stuff out of the way.
  • Unlock the gate and let us know where the outside outlets are.

Morning: setup and tear-off

The crew arrives in the morning with the dumpster or trailer and the materials. The first job is protecting your property. Tarps go over shrubs, flower beds and anything close to the walls.

Then the old roof comes off, all the way down to the wood deck. We don’t lay new shingles over an old roof. A full tear-off is the only way to see the decking and fix it before the new roof goes on. The old shingles, nails and underlayment go straight into the dumpster, not into your yard.

This is the loudest part of the day. Expect scraping, thumping and a lot of foot traffic overhead for a few hours.

Checking the deck

Once the old roof is off, we walk the entire deck. This is the one part of the job nobody can see until tear-off.

If a section is soft, rotted or damaged, we stop and show you photos of what we found. We replace it only by a written change order that you approve. You always know about it before it happens, and nothing gets added to your bill without your OK. On many homes, the deck is in good shape and we move right along.

Sometimes the deck surprises even us. In September, we were replacing a roof in Manchester that had old 1/4″ plywood decking. We inspected it thoroughly and couldn’t tell anything from the eaves, and from the attic it looked good, with no unusual bowing under our weight tests. Once the shingles and underlayment came off, it was clear that moisture had delaminated the plywood over time and the whole deck needed replacing. We explained everything to the homeowner in detail, laid out the options, and went with the best one: a full redecking of the home.

Delaminated 1/4 inch plywood roof decking found during a roof replacement in Manchester, TN
The old plywood deck on that Manchester roof. Years of moisture had pulled the layers apart, and you couldn’t see it until the shingles came off.
Old shingles on one side and new roof decking on the other during a roof replacement in Manchester, TN
Same roof, same day: the old roof on the left and the new decking going on the right.

Drying in: underlayment and ice and water shield

With the deck solid, the roof gets “dried in.” That means it’s protected from water even before a single shingle goes down.

  • Ice and water shield goes in the valleys and along the low edges of the roof. It’s a self-sealing membrane for the spots where water collects and leaks usually start. In Middle Tennessee, where ice storms come through and temperatures swing hard, this layer matters.
  • Synthetic underlayment goes down across the rest of the deck. It’s a second moisture barrier between the wood and the shingles, and it’s one of the most important parts of the roof that you’ll never see.

We never leave a roof open overnight. If weather or a deck repair slows things down, the roof is dried in and safe before the crew leaves. The Insurance Institute for Business & Home Safety puts a sealed roof deck and stronger roof edges at the top of its FORTIFIED Roof standard for the same reason: when shingles blow off, the layer underneath is what keeps rain out of the house.

Afternoon: shingles, flashing and ridge cap

Now the part you’ll actually see goes on.

  • Drip edge along the eaves and rakes, so water drips off the edge instead of curling back into the wood. The International Residential Code calls for drip edge at the eaves and rakes of shingle roofs.
  • Shingles, installed to the manufacturer’s spec, from the bottom edge up.
  • Flashing at walls, chimneys and other places where the roof meets something else. We install new step and counter flashing at walls and penetrations, because these spots are where leaks like to start. Our guide to where roofs leak most explains why.
  • Vents and pipe boots around anything that comes through the roof.
  • Ridge cap across the top to finish it off.

Cleanup and the final walk

The job isn’t done until the yard is clean. We pick up debris, clear the gutters, and run a magnetic roller over the yard and driveway to catch stray nails. Then we walk the finished roof with you, so you can see the work and ask anything you want.

You’ll get the warranty details in writing. Every roof we install has our lifetime workmanship warranty for as long as you own your home, plus the manufacturer’s material warranty.

How long does a roof replacement take?

Installs take about 1 day on average, tear-off and installation included. Larger, steep, metal or tile jobs can take longer, and your free inspection gives you an exact timeline for your home. A few things can add time:

  • Size and steepness. Bigger or steeper roofs take longer to work safely.
  • Layers. A second layer of old shingles means more tear-off.
  • Decking repairs you approve on a change order.
  • Weather. Rain or high wind can stretch the job or move the date.
  • Material. Metal and tile roofs can take longer than shingles.

Cold weather slows things a little, too. Our crews follow the manufacturer’s cold-weather rules, like storing shingles warm and hand-sealing them below 40 degrees. In March 2026, right after the January ice storm, our crew replaced a 34-square GAF Timberline HDZ roof on a Murfreesboro home through freezing temperatures, ice and on-and-off rain. They hand-sealed every shingle and finished in 2 days, and the house was watertight before the next storm. If you’re thinking about a cold-season install, read can you replace a roof in winter in Middle Tennessee.

Who will be on your roof

Don Hane, owner of Roof Troops Roofing, on a roof replacement job site in Manchester, TN
Don on the Manchester job in September.

Our own crew. Roof Troops employees do the work, not subcontractors, so the people on your roof are the people we’re responsible for. That’s true in Murfreesboro and everywhere we work, from Smyrna to La Vergne. If you’re still comparing companies, here’s what to look for in a Murfreesboro roofing company.

Frequently asked questions

How long does it take to replace a roof?
Installs take about 1 day on average, including tear-off. Larger, steep, metal or tile jobs can take longer, and your free inspection gives you an exact timeline. Weather and any decking repairs you approve can add time, too.

Do I need to be home on roof replacement day?
Not the whole day. It helps to be reachable in case we find decking that needs replacing, because we never add work without a written change order you approve. Most homeowners like to be there for the final walk.

Is it loud?
Yes, especially during tear-off in the morning. Plan a quiet spot or a day out for pets and anyone working from home.

Will my yard be full of nails?
No. We tarp your landscaping, haul the old roof away, and run a magnetic roller over the yard and driveway before we leave.

What happens if it rains?
We watch the forecast and move the date if rain or wind is coming. Once tear-off starts, we never leave a roof open overnight.

Do you use subcontractors?
No. Our crews are Roof Troops employees.


Ready to plan your new roof? Book a free inspection and get a written quote before any work starts. We’re locally owned and Veteran-owned, A+ rated with the BBB, and open 24 hours, every day.

Protect the Home. Earn the Trust.

DV
Written by

Don Hane, Navy Combat Veteran

Locally owned and Veteran-owned roofing in Murfreesboro, TN, since 2010. A+ rated with the BBB. Licensed #84570, fully insured, and a certified installer for GAF, TAMKO, CertainTeed, Malarkey and Owens Corning.

Contact the Owner

Your message goes straight to the owner of Roof Troops Roofing, a locally owned and Veteran-owned company serving Middle Tennessee. We reply fast. Phones answered 24 hours, every day.

Prefer to talk? Call 615-258-9977. Protect the Home. Earn the Trust.